Foundation
Obra negra · Mar–Sep 2025
Foundation progress
A short timelapse showing early foundation work and the project moving from site preparation into vertical construction.
Request current video tourShort chapters from foundation to rooftop.
Obra negra phase
These timelapses document the structural construction phase (obra negra) from March 2025 to September 2025. They show foundation and vertical progress before the current finish work captured in the July 2026 progress photos.
Watch each chapter below. Videos are hosted locally for now; longer chapters may move to YouTube or Vimeo later. Recent finish-stage photos remain on the Progress page.
Foundation
Obra negra · Mar–Sep 2025
A short timelapse showing early foundation work and the project moving from site preparation into vertical construction.
Request current video tour2nd floor
Obra negra · Mar–Sep 2025
A short timelapse showing construction progress on the 2nd floor as the building advances through vertical work.
Request current video tour3rd floor
Obra negra · Mar–Sep 2025
A short timelapse showing vertical construction progress on the 3rd floor during the structural (obra negra) phase.
Request current video tour4th floor
Obra negra · Mar–Sep 2025
A short timelapse showing structural progress on the 4th floor during the obra negra phase.
Request current video tour5th floor
Obra negra · Mar–Sep 2025
A short timelapse showing structural progress on the 5th floor, where the terrace common area will sit.
Request current video tour6th floor
Obra negra · Mar–Sep 2025
A short timelapse showing structural progress on the 6th floor during the obra negra phase.
Request current video tourRooftop / BBQ / Gym / Coworking
Obra negra · Mar–Sep 2025
A short timelapse showing rooftop structural progress for the future 7th-floor amenity level — BBQ / rooftop, gym, and coworking.
Request current video tourAsk for the latest construction update, reference renders, or a live video walkthrough.