Structure closed
Obra negra and obra gris are closed and documented through the timelapse chapters.
Current finishes, delivery closeout, and verified construction history.
Toronto Tower is in the final construction and completion phase. Current site work focuses on obra blanca: flooring, kitchen cabinetry, lighting, ceiling services, bathroom finishes, elevator/access readiness, utilities, and final delivery closeout.
Target full delivery: mid-September 2026.
The structural phase is documented separately on the Timelapses page.
Toronto Tower has moved from structural work into final finishes. The structural phase is documented in the timelapse chapters; the current Progress page focuses on obra blanca and delivery closeout.
Obra negra and obra gris are closed and documented through the timelapse chapters.
Current work is focused on flooring, kitchens, lighting, ceiling services, bathrooms, and final apartment details.
Remaining work includes final installation, utilities, elevator/access readiness, cleaning, documentation, and handover preparation.
Target full delivery remains mid-September 2026.
Recent site photos from July 6–9. These are construction-progress photos, not final delivery photos.
Current obra blanca work: flooring, kitchen cabinetry, lighting, windows, and bathroom details.
Interior shell views showing the exposed brick cores and open apartment layout.
Ceiling services, electrical rough-ins, and lighting work tied to final finishing.
Access works, material delivery, and vertical service preparation supporting the final delivery phase.
Simplified public timeline. Based on project baseline, construction media, and current site progress. Internal schedule fields may not reflect latest on-site progress.
Mar–Sep 2025
ClosedStructural work from foundation to rooftop was completed and is documented on the Timelapses page.
Closed: September 2025. No remaining public structural items.
Watch timelapsesSep 2025–Apr 2026
ClosedBuilding shell, masonry, principal rough-ins, facade preparation, waterproofing, and base-building work were completed during this phase.
Closed: April 2026. Any remaining touch-ups are included under final finishes and closeout.
Jun–Sep 2026
Active nowCurrent phase: flooring, kitchens, closets, lighting, ceilings, bathrooms, and apartment finishing details.
Remaining: Final installation, touch-ups, cleaning, quality assurance, and delivery closeout.
Jul–Sep 2026
In progressElevator installation and vertical-access readiness form part of the final building closeout.
Remaining: Installation completion, testing, and certification.
Jul–Sep 2026
Pending / in progressMeters, pumps, data and network items, final fixtures, inspections, and the handover package.
Remaining: Final approvals, inspections, and delivery documentation.
Mid-Sep 2026
Target milestoneTarget delivery window for the completed building, subject to final completion and applicable approvals.
Mar–Sep 2025
Structural work from foundation to rooftop was completed and is documented on the Timelapses page.
Closed: September 2025. No remaining public structural items.
Watch timelapses Obra negra / structure ran from Mar–Sep 2025 and is closed on the public timeline.Sep 2025–Apr 2026
Building shell, masonry, principal rough-ins, facade preparation, waterproofing, and base-building work were completed during this phase.
Closed: April 2026. Any remaining touch-ups are included under final finishes and closeout.
Obra gris / building shell ran from Sep 2025–Apr 2026 and is closed on the public timeline.Jun–Sep 2026
Current phase: flooring, kitchens, closets, lighting, ceilings, bathrooms, and apartment finishing details.
Remaining: Final installation, touch-ups, cleaning, quality assurance, and delivery closeout.
Obra blanca / finishes runs from Jun–Sep 2026. Status as of July 2026: Active now.Jul–Sep 2026
Elevator installation and vertical-access readiness form part of the final building closeout.
Remaining: Installation completion, testing, and certification.
Elevator / vertical access runs from Jul–Sep 2026. Status as of July 2026: In progress.Jul–Sep 2026
Meters, pumps, data and network items, final fixtures, inspections, and the handover package.
Remaining: Final approvals, inspections, and delivery documentation.
Utilities and delivery closeout runs from Jul–Sep 2026. Status: Pending / in progress.Mid-Sep 2026
Target delivery window for the completed building, subject to final completion and applicable approvals.
Target full delivery is mid-September 2026, subject to final completion and applicable approvals.Timeline is simplified for buyers. Target delivery remains mid-September 2026 and is subject to final completion, sales documentation, and applicable approvals.
Target full delivery: mid-September 2026.
Target full delivery remains mid-September 2026. The remaining work is focused on final installation, utility closeout, elevator/access readiness, documentation, cleaning, and handover preparation.
These interior reference renders show design direction only. Final finishes, furniture, equipment, and specifications are subject to final confirmation and sales documentation.
Furniture is not included. Reference renders show design direction only.




Foundation-to-rooftop timelapse chapters from the obra negra phase (March–September 2025) are on a dedicated page so they stay easy to browse.